Another milestone event today – delivery of the tower and blades for our first turbine in Hampshire!

The two tower sections together are nearly 40m long and weigh just under 30 metric tonnes. Each of the blades is 19m long. Foundation excavations are due to start next week with the concrete pour to follow shortly after.

[youtube=http://www.youtube.com/watch?v=6WbvZgkjgZI]